| Client |
Peabody Energy |
| Location |
Mudgee - New South Wales |
| Requirement |
Evaporation system running on pit 2 collection pond to reduce on site water levels |
| Product |
Mine water |
| Equipment |
- Turbomist accelerated evaporation fans
- 1 X tier 3 - 330kva generator
- 1 X water winning supply pump
- 1 X soft start control panel
- 1 X REL base system monitoring and full telemetry control
- Full pipework and cabling
|
| Additional Equip |
- Bulk diesel fuel supply tanks, auto start alarm and signage
|
| Services Provided |
Engineering, design, installation and commissioning, service, maintenance and decommissioning |
| Since |
2010 |
| Contract |
8 months |