Temporary accelerated evaporation from site

Project Profile

Download PDF Project Profile
Client Peabody Energy
Location Mudgee - New South Wales
Requirement Evaporation system running on pit 2 collection pond to reduce on site water levels
Product Mine water
Equipment
  • Turbomist accelerated evaporation fans
  • 1 X tier 3 - 330kva generator
  • 1 X water winning supply pump
  • 1 X soft start control panel
  • 1 X REL base system monitoring and full telemetry control
  • Full pipework and cabling
Additional Equip
  • Bulk diesel fuel supply tanks, auto start alarm and signage
Services Provided Engineering, design, installation and commissioning, service, maintenance and decommissioning
Since 2010
Contract 8 months