| Client |
Alacer Gold |
| Location |
Higginsville, Goldfields - Western Australia - Western Australia |
| Requirement |
To dewater chalice pit (200lt/sec @ 200m TDH) |
| Product |
Mine and rain water |
| Equipment |
- 2 x 220kW 1000v pontoon pumps
- 2 x 250Hp Diesel driven trailer mounted transfer pumps
- 1 x 750kVA diesel generator set
|
| Additional Equip |
- 2 x 55,000 Litre bulk diesel fuel supply
- tanks – diesel pump and generator remote
- fuel supply system spools, manifolds and all
- associated tie-ins
|
| Services Provided |
Engineering, design, installation, commissioning and decommissioning as well as transport of HDPE and pumping system and full design of pipe system |
| Since |
2011 |
| Contract |
6 months |