Temporary pond water transfer pump system from RDA pond

Project Profile

Download PDF Project Profile
Client Newmont
Location Boddington Gold Mine - Boddington, Western Australia - Western Australia
Requirement To transfer water from the RDA pond (360lt/sec @ 76m tdh) with one active pump and one standby
Product Process plant residue disposal water
Equipment
  • 2 X 950 hp diesel driven regent mega-flow
  • t300 high flow/medium head pumps in
  • parallel as a temporary transfer system
Additional Equip
  • 10,000 Litre bulk diesel fuel supply tank – diesel pump remote fuel supply system
  • Spools, manifolds and all associated tie-ins
  • 1 x pump with engine for back-up/redundancy
Services Provided Engineering, design, installation commissioning and decommissioning
Since 2010
Contract 9 Months