| Client |
Newmont |
| Location |
Boddington Gold Mine - Boddington, Western Australia - Western Australia |
| Requirement |
To transfer water from the RDA pond (360lt/sec @ 76m tdh) with one active pump and one standby |
| Product |
Process plant residue disposal water |
| Equipment |
- 2 X 950 hp diesel driven regent mega-flow
- t300 high flow/medium head pumps in
- parallel as a temporary transfer system
|
| Additional Equip |
- 10,000 Litre bulk diesel fuel supply tank – diesel pump remote fuel supply system
- Spools, manifolds and all associated tie-ins
- 1 x pump with engine for back-up/redundancy
|
| Services Provided |
Engineering, design, installation commissioning and decommissioning |
| Since |
2010 |
| Contract |
9 Months |